Certificate III in Construction Waterproofing – CPC31420
Certificate III in Construction Waterproofing – CPC31420
This qualification is designed to meet the needs of workers who undertake waterproofing for residential and commercial construction work. The qualification has core unit of competency requirements that cover common skills for the construction industry, as well as the specialist field of work, construction waterproofing. Waterproofers apply membranes and special coatings to protect contents and the structural integrity of buildings.
Occupational titles may include:
State and territory jurisdictions may have different licensing, legislative, regulatory or certification requirements. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCCWHS1001 Prepare to work safely in the construction industry meets this requirement.
There are no entry requirements for this qualification.
To achieve this qualification, the candidate must demonstrate competency in:
Electives must be selected as follows:
Prerequisite units
An asterisk (*) against a unit code below indicates that there is a prerequisite requirement that must be met. Prerequisite unit(s) must be assessed before assessment of any unit of competency with an asterisk. Check the unit of competency for information on specific prerequisite requirements. All prerequisite requirements are packaged in the qualification.
Core units | ||
CPCCOM1012 | Work effectively and sustainably in the construction industry | |
CPCCOM1013 | Plan and organise work | |
CPCCOM1014 | Conduct workplace communication | |
CPCCOM1015 | Carry out measurements and calculations | |
CPCCOM2001* | Read and interpret plans and specifications | |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry | |
CPCCWP2001* | Handle waterproofing materials | |
CPCCWP2002* | Use waterproofing tools and equipment | |
CPCCWP2004* | Prepare surfaces for waterproofing application | |
CPCCWP3001* | Apply waterproofing process to below-ground level wet areas | |
CPCCWP3002* | Apply waterproofing process to internal wet areas | |
CPCCWP3003* | Apply waterproofing process to above-ground external wet areas | |
CPCCWP3004* | Apply waterproofing remedial processes | |
CPCCWP3005* | Assess construction waterproofing process | |
|
| |
Elective units | ||
BSBESB301 | Investigate business opportunities | |
BSBESB407 | Manage finances for new business ventures | |
CPCCCA3012* | Frame and fit wet area fixtures | |
CPCCCM2002* | Carry out hand excavation | |
CPCCCM2006 | Apply basic levelling procedures | |
CPCCCM2007* | Use explosive power tools | |
CPCCCM2008* | Erect and dismantle restricted height scaffolding | |
CPCCCM2009* | Carry out basic demolition | |
CPCCCM2012* | Work safely at heights | |
CPCCCM3001* | Operate elevated work platforms up to 11 metres | |
CPCCCO2013* | Carry out concreting to simple forms |
Certificate III in Construction Waterproofing
CPC31420